At a glance
Start with the size of your space, then choose the roof, colours and controls. If you would like side screens or lighting, include them from the start so their fittings and wiring can be planned together. The available options vary by model.

Frame layout and finish
Mark post locations, roof projection and clearances around doors or existing equipment. Use a named finish reference and a physical sample when matching other metalwork. Record whether drawings show overall dimensions or clear internal dimensions.
Fabric, louvers and the open position
Compare fabric samples in the actual light and ask how the material is maintained. For fabric roofs, record the stacked area when retracted. For louvers, confirm the movement type and required clearance; do not infer rotation or retraction from a closed-roof photograph.
Motor, controls and lighting
Decide how you want to operate the shade: by remote, wall switch or a compatible sensor. Check the motor and power supply, and ask how this model is operated during a power cut. If you want to connect it to a smart-home system, share the exact device details so compatibility can be checked.
Side screens and service access
Specify each side separately, including entrances that must remain accessible. Show the headbox, guide track and cable positions on the drawing. Keep access to motors, drains and light drivers, and confirm how replacement fabric or components can be removed.
Choose options in the order they affect the space
Start with roof movement and the clear opening between posts. Decide next which sides need screens, because their boxes and guides take up space on the structure. Then place lights and controls around that arrangement. Choosing all three separately can leave a light where a screen box needs to sit or a control point behind furniture. One combined drawing makes these conflicts easier to spot.
Think through the version you may want later
If you may add screens later, ask what needs to be prepared now: fixing faces, cable routes and access to the box. A blank space beside a post is not proof that any screen will fit. Keep the future option linked to a compatible model and drawing. You can postpone buying an accessory while still planning the space it will require.
Explore this topic: Ordering a roof now and side screens later: what to plan?
Define what can change without redesign
Colour and control preferences are different from changing support positions or roof dimensions. Ask the supplier to identify which requests are standard options and which need a revised drawing or specification. Confirm side screens and lighting early because their interfaces may affect the frame arrangement. When considering a future upgrade, request the relevant preparation in writing rather than assuming any accessory can be attached later to any beam.
Check the complete operating sequence
Review the proposal in the positions people will actually use: fully open, partly open and closed. Check what remains in the opening, where moving parts travel and whether someone can still reach the controls. Agree who demonstrates normal operation at handover and how the owner obtains the instructions for the supplied motor and accessories. A useful demonstration includes stopping midway and operating each zone separately. Record any limitation against the relevant component rather than relying on a general promise that the whole installation is automatic or suitable for every weather condition.
Before you request a quotation
- Dimensioned configuration drawing
- Finish, material and control references
- Included and optional items separated
