Define the brief and responsibilities
Bring together site photographs, dimensions, preferred use and any drawings. Record the delivery location and whether you need supply only, installation or coordination with another contractor. A shared brief reduces assumptions when different suppliers prepare proposals.
Approve drawings and material references
Review overall dimensions, clear openings, post locations, drainage and control positions. Confirm colors using approved references and record any changes. Establish when the specification becomes fixed and how later changes affect price and schedule; dates should be agreed for the actual order.
Coordinate dispatch and site readiness
Confirm package count, dimensions, handling needs and access before dispatch. Identify who unloads, stores and checks the goods, and how visible transit damage is recorded. Make sure foundations, access, power and the agreed installation team are ready before scheduling assembly.
Inspect, demonstrate and hand over
Check the supplied references against the order and record appearance, opening travel, controls and drainage observations using the agreed method. List outstanding items with an owner and target date. Hand over manuals, serial references, maintenance requirements and warranty contact details, then keep a signed record.
Link the delivery date to site readiness
Check when the supporting work, cable provision and delivery access will be ready before agreeing the installation sequence. Manufacturing, transport and on-site assembly are separate stages; the duration depends on the chosen product and destination. Identify where packaged components can be stored safely and kept clear of other trades. If the site changes, share the revised plan before the delivery arrangement is fixed.
Make the handover useful to the people using it
Ask the installer to demonstrate normal opening and closing, the controls fitted to your order and access for routine care. In a shared or commercial space, label control zones so staff can identify which roof or screen they are moving. Keep the product details and service contact with the operating instructions. A short practical demonstration is easier to remember than discovering unfamiliar controls during a busy evening.
Use the agreed configuration as the receiving record
At receipt, compare package references with the final order rather than an early quotation. Record which components have been checked and which remain packed for later installation. If something differs, describe the package number, part and drawing reference so the supplier can investigate without guessing. Keep receiving records separate from operational acceptance; a complete delivery and a correctly commissioned installation are related but different stages of the project.
Compare quotations for the same specification
Give each supplier the same drawing revision and a dated list of options. Ask them to distinguish included items, alternatives and work to be arranged on site. When a price changes, request a short description of what changed with it: dimensions, fabric, drive, mounting parts, packing or delivery scope. Keep decisions in one approved schedule rather than scattered across messages. Before payment for production, compare that schedule with the final drawing and order acknowledgement. This creates a usable record for receiving the goods and resolving a missing or substituted component.