At a glance
Plan how the pergola will reach its final position, not just when it ships. Check the package sizes, unloading access and who will install it. For an overseas order, ask a local freight or customs adviser about the documents and charges for your destination.

Write down the delivery responsibilities
Record the exact named delivery place and agreed trade term. ICC explains that Incoterms rules do not determine ownership or payment terms. Document those separately in the sales agreement. Ask your logistics provider to explain the responsibility boundaries for the selected arrangement before you compare freight offers.
Review the document set before dispatch
Ask the broker or forwarder which documents and product information they need for this destination. Reconcile the commercial description, quantities and packing list with the order. Obtain crate dimensions, gross weights and lifting instructions early enough to plan transport and unloading. Leave tariff classification and applicable charges for qualified local confirmation.
Separate production, transit and installation dates
Ask when production starts after drawings and finishes are approved, and what can change that date. Track dispatch, transit, clearance, final delivery and installation as separate milestones. Allow a planning buffer for unresolved steps and avoid scheduling a venue opening solely around an estimated vessel arrival.
Prepare for arrival and record condition
Confirm vehicle access, unloading equipment, a suitable storage area and the person authorized to receive the shipment. Photograph packaging and visible condition, count packages against the packing list and follow the agreed process for reporting damage or shortages. Keep hardware and drawings identified by module for the installer.
Plan the last few metres of delivery
A delivery vehicle reaching the property does not mean a long package can reach the terrace. Check gate openings, turns, stairs and the route through the building against the actual packing dimensions and weight. Ask the installer how the parts will be moved and where they can be stored dry until assembly. Share access photographs before arranging unloading equipment or a delivery date.
Use package numbers to make discrepancies traceable
Ask for a packing list that connects package numbers to the order and modules. On arrival, first record the number of packages and their visible condition; opening a crate and checking its contents is a separate step. If a part seems missing, note the package number, expected item, quantity found and photograph reference. Send that record to the agreed contact and follow the reporting procedure in your delivery documents. Keep the relevant labels until the discrepancy is resolved. Do not invent a universal claim deadline: confirm the applicable procedure before dispatch so the receiver knows what to do.
Separate responsibility for costs from responsibility for risk
ICC describes Incoterms rules as clarifying delivery tasks, costs and risks. For your order, ask the logistics provider to explain the selected rule against the named place and agreed edition. Write down who arranges each stage and which quoted charges belong to it, rather than treating “shipping included” as a complete answer. If transport cover is proposed, request the actual policy or cover details and the contact for reporting damage. The fact that one party pays freight is not enough information to settle every responsibility. Keep the agreed delivery scope with the order and confirm any unresolved point with the responsible provider.
Compare quotations for the same specification
Give each supplier the same drawing revision and a dated list of options. Ask them to distinguish included items, alternatives and work to be arranged on site. When a price changes, request a short description of what changed with it: dimensions, fabric, drive, mounting parts, packing or delivery scope. Keep decisions in one approved schedule rather than scattered across messages. Before payment for production, compare that schedule with the final drawing and order acknowledgement. This creates a usable record for receiving the goods and resolving a missing or substituted component.
Before you request a quotation
- Named place, responsibilities and separate payment terms
- Confirmed document list, crate sizes and weights
- Unloading plan, installer and staged schedule
