The QHC matrix marks the 7 × 4 m combination with three arms and three wall brackets. Quote and check that specific arrangement rather than copying the parts list from a smaller two-arm awning.

Match the quotation and drawing
Require the model, overall width, projection, arm count and bracket count on the same drawing revision. A generic product picture is not enough to identify the supply configuration for this size.
Locate the structural fixing points
Three brackets do not prove that the existing wall is suitable. Supply wall construction details and openings, then have bracket positions and anchoring checked for the actual substrate and project.
Make receipt inspection size-specific
At delivery, compare labels and packed parts with the approved list before installation. Record any missing bracket or changed arm specification immediately; do not improvise a substitute on site.
Locate all three fixing positions on the wall
For the listed 7 × 4 m QHC combination, the three-arm and three-bracket arrangement should be visible in the proposal. Show windows, joints and decorative cladding behind it. A continuous-looking façade may conceal different substrates, so the fixing positions cannot be chosen only for visual symmetry. The installer needs to identify how each bracket connects to a suitable supporting part of the building.
Check the complete set before lifting it into place
Match the supplied arms and brackets with the order drawing, keeping the labels until installation is complete. Discuss the handling plan using the actual package dimensions and weight. For a long assembly, access and lifting arrangements should be settled before delivery. Do not infer the required number of installers or lifting method from a photograph of a smaller awning.
Check the support layout for this exact configuration
The documented three-arm arrangement should be carried into the installation drawing, together with its matching brackets. Do not infer that the arms can be redistributed around obstructions without review. Mark pipes, windows and changes in wall construction against the proposed positions. Ask how the cassette is handled and supported during installation as well as in service. The brochure’s component count is a starting point for coordination, not a substitute for the mounting drawing.
Coordinate the roof with the supporting structure
A product outline is only one part of the installation. Show how the roof loads will pass into the wall, posts or supporting frame, and agree who will check the existing structure. The final arrangement should also show how water leaves the roof and where cables enter without obstructing a moving component. If supports or drainage change, update the roof drawing as well as the site plan. Keep fabrication dimensions separate from preliminary measurements until the interfaces have been agreed; otherwise a correctly manufactured product can still arrive with an unsuitable connection to the building.
Specifications behind this guide
QHC full-cassette awning
- Listed width range
- 2.05-7 m
- Listed projection range
- 1.5-4 m
- Cassette section
- 247 × 155 mm
- Arm wall thickness
- 3.5 mm
| Projection (m) | Minimum width (m) |
|---|---|
| 1.5 | 2.05 |
| 2 | 2.55 |
| 2.5 | 3.05 |
| 3 | 3.55 |
| 3.5 | 4.05 |
| 4 | 4.55 |
The 7 × 4 m configuration uses three arms and three wall brackets. Confirm LED colour temperature when ordering.
See model detailsBefore you approve the order
- Confirm model, overall width, projection and the drawing revision in one written order.
- Match mounting parts, fabric reference, finish and controls to the quotation; document any substitution.
- Agree delivery contents, site-work responsibilities, operating instructions and the service contact.
