Residential living

Garden-facing work terraces

Position the desk to reduce direct reflections before adding a side screen.

Plan your project
Garden-facing work terraces

Plan the details

Position the desk to reduce direct reflections before adding a side screen. Compare sample fabrics at working hours and plan a sheltered cable route without crossing the doorway.

  • Measure the usable area and leave doors and circulation clear.
  • Choose roof shade, side screening or a combination to suit the sun direction.
  • Coordinate fixings, drainage and power before installation.

Choosing the shade system

Measure the opening at the top, middle and bottom, then record the finished floor level across its width. Check the space taken by the box, guides and bottom bar rather than treating the screen as a thin line on the plan. Compare fabric samples from inside and outside during the relevant hours, with lights on for an evening privacy check. Fabric properties are not the performance of the complete assembly. Confirm the selected dimensions, guides, motor and maintenance access as one configuration before ordering.

Before you request a quotation

Send a dimensioned sketch, photographs facing the building and looking outwards, and a furniture plan with the main access routes. Mark estimates separately from measurements that have been checked. Include the hours of use, the shade or privacy problem you want to solve and any restrictions on fixing to the building. Ask the quotation to separate the product, options, delivery and installation responsibilities. Confirm the drawing revision and selected finishes before production; a rendered scene is a discussion aid, not an installation drawing.

Daily use and handover

Walk through the finished layout with chairs occupied and the shade in its different positions. Check that doors, controls, drainage points and service covers remain accessible. Agree who will demonstrate the supplied functions and provide the manufacturer’s care and operating instructions. Record any weather-related limitations for the actual model, together with the service contact. For shared spaces, assign responsibility for closing, cleaning and reporting faults. Avoid hanging new loads or adding equipment without confirming that the relevant structure and electrical arrangement can accept them.

Products for this space

Before you choose: practical guides

Check measurements, operating limits and the details to agree with your supplier. Each guide explains what still needs site-specific confirmation.

All spaces