Confirm post sections, gutter sections and the outlet route together. The T-series brochure lists different components for T1200 than for T700 and T900; a gutter dimension alone does not establish drainage capacity.

Match the post and gutter set
T700 and T900 list 125 × 90 × 2 mm posts and 150 × 125 × 2.5 mm gutters. T1200 lists 170 × 170 × 3 mm posts and 180 × 150 × 3 mm gutters.
Draw the discharge destination
Locate downpipes or outlets on the site plan and check paths, entrances and adjacent properties. Confirm whether drainage connections are included in product supply or require separate site work.
Resolve foundations before finishes
Coordinate post bases with the underlying structure before laying finished paving. Leave the agreed service access visible in the drawing instead of hiding unresolved drainage behind completed landscape work.
Follow the water beyond the post
Trace the intended route from the fabric into the gutter and from the outlet to the site drain. Identify where that outlet sits relative to doors, seating and neighbouring property. A gutter can collect water yet still leave an inconvenient discharge point. Show the final route on the ground plan before choosing post positions or finishing the paving, particularly if several roof modules meet on the same terrace.
Keep outlets and access visible in the finished design
Planters, raised decking and decorative covers can hide an outlet after the roof has been installed. Include them on the drawing rather than adding them later without checking. Leave a practical way to inspect and clear accessible collection points as described in the maintenance instructions. The post and gutter dimensions identify components; they do not replace a site-specific drainage arrangement.
Show how drainage connects across multiple bays
For a roof made up of several bays, label each gutter and outlet on one overall drawing. Ask which connections are supplied with the roof and which must be completed on site, including the connection to the ground drainage. Review those positions alongside doors and screen guides before enclosing the frame. If a post or a bay boundary moves, update the water route on the same revision. The installation team should be able to follow the agreed drawing without having to decide on site which outlet serves which roof section.
Explore this topic: Restaurant canopy planning: lessons from the 192 m² brochure case
Coordinate the roof with the supporting structure
A product outline is only one part of the installation. Show how the roof loads will pass into the wall, posts or supporting frame, and agree who will check the existing structure. The final arrangement should also show how water leaves the roof and where cables enter without obstructing a moving component. If supports or drainage change, update the roof drawing as well as the site plan. Keep fabrication dimensions separate from preliminary measurements until the interfaces have been agreed; otherwise a correctly manufactured product can still arrive with an unsuitable connection to the building.
Specifications behind this guide
T-series retractable folding roofs
- Projection up to 7 m
- T700
- Projection up to 9 m
- T900
- Projection up to 12 m; area ≤72 m²
- T1200
| Model | Width limit (m) | Projection limit (m) | Rail section |
|---|---|---|---|
| T700 | 8 | 7 | 130 × 70 × 2.5 mm |
| T900 | 8 | 9 | 170 × 98 × 2.5 mm |
| T1200 | 8 | 12 | 200 × 130 × 2.5 mm |
T1200: width ≤8 m, projection ≤12 m and total unit area ≤72 m² must all be met. Standard PVC fabric; Sauleda available as an option.
See model detailsBefore you approve the order
- Confirm model, overall width, projection and the drawing revision in one written order.
- Match mounting parts, fabric reference, finish and controls to the quotation; document any substitution.
- Agree delivery contents, site-work responsibilities, operating instructions and the service contact.