Specify the destination electrical supply, desired control method and service access in the enquiry. A brochure photo or the word motorized does not establish voltage, smart-home compatibility or included sensors.

Give the electrical requirements explicitly
Provide voltage and frequency and request the proposed motor and controller references. Confirm wiring scope and connection responsibility instead of assuming the supplier’s default package matches the destination.
Separate desired functions from confirmed options
List remote control, wall switching, lighting control and sensor requests separately. Ask for compatible component references and operating instructions before describing the system as integrated with a building-control platform.
Plan a usable service route
Record motor-side access, isolation arrangements and the service contact on the handover sheet. Electrical connection and configuration should follow the supplied instructions and applicable local requirements.
Explore this topic: Awning retracting with no wind? What to record before calling for service
Describe the functions you want in everyday terms
Say whether you want to open one awning, control several together or operate lights separately. If a phone app or home-automation connection matters, give the existing device and system details rather than just requesting smart control. The motor, receiver and control method need to be compatible. Ask which remotes, sensors and accessories are included, and confirm that the equipment needed for each requested function is listed in the order.
Plan where the electrical parts can be reached
Provide the installation country and the available supply information for the local electrician to verify. Show where the cable will enter and where the controller can be accessed. Ask for the supplied model’s power-cut procedure; do not assume every electric awning has manual operation. Keep the controls identifiable for anyone who will use or service the system later.
Confirm the complete control chain
Identify the power supply, motor reference, receiver or controller, remote and optional sensors as separate components. A matching supply voltage does not by itself confirm that controls communicate with each other. Ask which functions are included, how individual units are addressed and who completes setup after installation. If using a sensor, record its compatible equipment and the intended response. Keep this information with the commissioning instructions for the exact supplied configuration.
Check the complete operating sequence
Review the proposal in the positions people will actually use: fully open, partly open and closed. Check what remains in the opening, where moving parts travel and whether someone can still reach the controls. Agree who demonstrates normal operation at handover and how the owner obtains the instructions for the supplied motor and accessories. A useful demonstration includes stopping midway and operating each zone separately. Record any limitation against the relevant component rather than relying on a general promise that the whole installation is automatic or suitable for every weather condition.
Specify wind control as a complete system
Somfy describes Eolis RTS as a wind sensor that sends a retraction command to a compatible awning motor, with an adjustable wind threshold. This is an example of an operating control, not a load rating for the supporting structure. When ordering, list the motor, receiver and sensor references together, plus their supply requirements and control protocol. Ask the installer to demonstrate the wind response and explain the operating instructions at handover. Confirm whether the sensor is included in the quotation. Referencing this Somfy example does not mean that this device or its specifications are supplied with every model on this website.
Describe control scenarios before selecting accessories
Write down what the owner expects to do, rather than requesting an unspecified “smart motor”. A home might need one remote to operate two awnings independently, a separate command for the lights and a convenient way to stop movement. A restaurant might need staff to control each terrace zone without changing a neighbouring zone. Put these actions into a schedule and ask the supplier to identify which devices carry them out. Distinguish a local remote, a wall control, a phone application and a third-party building control interface; do not assume one implies the others. Record any bridge, receiver, subscription or network requirement in the quotation. Use this list to agree the controls with your supplier; the available combinations depend on the awning model.
Resolve competing commands and interruptions in the handover plan
Ask the installer to explain the behaviour of the supplied system when more than one command is possible. Examples include a user pressing extend while a wind response is active, a timer requesting movement after a manual stop, or an application losing its connection. The answer must come from the manuals and settings for the actual devices, not from the behaviour of another brand. Similarly, ask what the owner should do after a power interruption and how to identify a control fault. Do not assume that an awning includes a manual crank or that every motor can be operated during an outage. Record the approved instructions and the service contact. Any demonstration of a sensor function should use the manufacturer’s commissioning procedure; it should not require waiting for hazardous weather or improvising a test.
Make commissioning records useful for the next owner or technician
An effective handover connects each installed unit to a drawing and a control channel. Label the zones consistently in the quotation, installation drawing and operating guide. Record the motor and control references, the manuals supplied, the demonstrated functions and any unresolved item with a responsible contact. Ask who will manage application access if it is part of the order, and agree how the owner can recover or transfer access without relying on a former employee’s personal account. Keep credentials out of public project documents. For commercial premises, identify who will train new staff and where the operating instructions will be kept. Sign-off should distinguish functions actually demonstrated from options discussed but not supplied. This makes future servicing more straightforward and reduces disputes over what “automatic control included” was intended to mean.
Specifications behind this guide
QHA full-cassette awning
- Listed width range
- 2-6 m
- Projection in size table
- 1.5-3.5 m
| Projection (m) | Minimum width (m) |
|---|---|
| 1.5 | 2 |
| 2 | 3 |
| 2.5 | 3.5 |
| 3 | 4 |
| 3.5 | 4.5 |
The 3.5 m projection requires a width of at least 4.5 m and confirmation of availability. Ceiling mounting requires custom brackets.
See model detailsQHB full-cassette awning
- Listed width range
- 2-6 m
- Listed projection range
- 1.5-4 m
| Projection (m) | Minimum width (m) |
|---|---|
| 1.5 | 2 |
| 2 | 2.5 |
| 2.5 | 3 |
| 3 | 3.5 |
| 3.5 | 4 |
| 4 | 4.5 |
A 4 m projection requires at least 4.5 m width. Arm lighting is optional; select fabric, manual or motorised operation, and mounting brackets with your order.
See model detailsQHC full-cassette awning
- Listed width range
- 2.05-7 m
- Listed projection range
- 1.5-4 m
- Cassette section
- 247 × 155 mm
- Arm wall thickness
- 3.5 mm
| Projection (m) | Minimum width (m) |
|---|---|
| 1.5 | 2.05 |
| 2 | 2.55 |
| 2.5 | 3.05 |
| 3 | 3.55 |
| 3.5 | 4.05 |
| 4 | 4.55 |
The 7 × 4 m configuration uses three arms and three wall brackets. Confirm LED colour temperature when ordering.
See model detailsT-series retractable folding roofs
- Projection up to 7 m
- T700
- Projection up to 9 m
- T900
- Projection up to 12 m; area ≤72 m²
- T1200
| Model | Width limit (m) | Projection limit (m) | Rail section |
|---|---|---|---|
| T700 | 8 | 7 | 130 × 70 × 2.5 mm |
| T900 | 8 | 9 | 170 × 98 × 2.5 mm |
| T1200 | 8 | 12 | 200 × 130 × 2.5 mm |
T1200: width ≤8 m, projection ≤12 m and total unit area ≤72 m² must all be met. Standard PVC fabric; Sauleda available as an option.
See model detailsBefore you approve the order
- Confirm model, overall width, projection and the drawing revision in one written order.
- Match mounting parts, fabric reference, finish and controls to the quotation; document any substitution.
- Agree delivery contents, site-work responsibilities, operating instructions and the service contact.
